砖厂脱硫塔在运输,安装,使用时应该注意以下几个问题 |
添加时间:2019/4/18 14:44:50 浏览次数: |
1、设备在运输过程中应避免剧烈摔、碰、划伤和各种外来压力。 1. The equipment should avoid severe falls, collisions, scratches and various external pressures during transportation. 2、安装前首先检查设备是否完好,基础及各部尺寸和位置是否正确。用倒链或吊车就位,然后将支架与基础垫焊牢。 2. Before installation, check whether the equipment is in good condition and the size and position of the foundation and all parts are correct. Place the chains or cranes in place, and then weld the bracket to the base pad. 3、打开检查孔、检查喷嘴管是否安装就位。调整好喷头出口位置,使其出口位置于迎风面上,形成垂直的水幕。 3. Open the inspection hole and check whether the nozzle tube is installed in place. Adjust the position of the nozzle outlet so that the nozzle outlet is located on the windward side to form a vertical water curtain. 4、严格注意各接口的连接,确保其密封性。净化器启动前要空载试运,检查是否由于运输受到震动,法兰连接处是否有漏气现象,如有漏气用石棉绳堵好,再正式运行。 4. Strict attention should be paid to the connection of each interface to ensure its sealing. Before starting, the purifier should be put into trial operation without load. Check whether there is air leakage at flange connection due to vibration of transportation. If air leakage is blocked by asbestos rope, it will be operated formally. 5、安装时必须确保烟气进口气流水平径向进入净化器。 5. When installing, it is necessary to ensure that the flue gas inlet gas enters the purifier horizontally and radially. 6、砖窑运行前,先开水泵,使净化器处于运行状态,喷水雾化,然后再开启鼓、引风机。 6. Before the operation of brick kiln, first boil the water pump, make the purifier in operation, spray water atomization, and then open the blower and induced draft fan. 7、运行时在水池的起端加入氧化钙(消石灰),使其在水中循环,石灰含量视其水中的PH值大小而定,在正常运行时PH值保持10-13。当低于10时再加入石灰。 7. Calcium oxide (slaked lime) is added at the beginning of the pool to make it circulate in the water. The content of lime depends on the PH value in the water and keeps 10-13 in normal operation. When less than 10, add lime. 8、运行期间要定期检查喷头工作情况,如有堵塞、松动及喷口位置不对时要即时处理。砖窑运行时一般都是微微白烟,当有黑烟时,要检查水泵是否匹配合适,扬程低喷水不能雾化,冒黑烟;另一种情况喷嘴堵塞,不能雾化冒黑烟。可更换喷嘴或将喷嘴投开,清除污物继续使用当发生火灾时,砖厂脱硫塔在任何季节通过各种竖井产生烟囱效应。也可能通过地板的空调管道,甚至穿过一些看不见的孔,产生小范围的烟囱效应。这在下面有明确规定。施工现场应干净整洁,采取通风措施,有害气体的含量不得超过规定要求。施工现场禁止存放易燃材料,烟囱防腐涂料除外。 8. Check the working condition of the nozzle regularly during operation. If there is blockage, loosening and misalignment of the nozzle position, it should be handled immediately. Brick kilns are generally slightly white smoke when running. When there is black smoke, check whether the pump matches properly. Low head spray water can not atomize and emit black smoke. In another case, the nozzle is blocked and black smoke can not be atomized. Replaceable nozzles or nozzles are thrown open to www.yanglaoyua.cnwww.shiguanyin.cnwww.luomazhu.net.cn www.xingtaibanjia.com.cnremove dirt www.zhangjiakoubanjia.cnwww.foxiangdiaoke.cnand continue to use. In case of fire, desulfurization tower of brick factory produces chimney effect through various vertical wells in any season. It may also produce a small chimney effect through air-conditioning pipes on the floor, or even through invisible holes. This is clearly stipulated below. The construction site shall be clean and tidy, ventilation measures shall be taken, and the content of harmful gases shall not exceed the stipulated requirements. Flammable materials are forbidden to be stored at the construction site, except for chimney anticorrosive coatings. |
上一页 玻璃钢脱硫塔的主要结构是什么? |
下一页 生物脱硫的技术优势 |
Copyright © 技术支持:遨游网络